In a typical masonry wall application there are three basic types.
Thru wall flashing roof and brick.
And 3 cap the block with membrane overlapping the first two pieces and bridging the gap between the block and the wall sheathing.
Installing through wall flashing correctly particularly on a sloped roof to wall intersection involves a detailed process and requires close coordination between the roofer and the mason.
Brick veneer flashing the first detail shows the typical method of flashing a brick wythe.
Properly installed flashing covers the seam between the wall and the roof and directs water onto the roof.
Step 6 install through wall flashing.
Through wall flashing at the base of the walls should be located 2 or 3 50 or 75 mm above finished grade.
Thru wall flashing originates with a vertical leg in contact with the exterior sheathing tucked or shingled up under the house wrap and a horizontal leg that extends all the way through the masonry to the exterior surface of the wall.
In an ideal installation the flashing will extend under the brick veneer so that there is.
Masonry walls which are largely composed of brick concrete masonry units cmu cast stone and other related units typically absorb moisture and rain.
The flashing must extend up at least 8 weeps spaced a maximum of 24 o c and pea gravel are rec ommended.
True through wall flashing for brick veneer.
Step 7 flashing your chimney.
However the term through wall flashing is typically reserved for veneer sidings like brick stone and stucco.
Through wall counterflashing reglet counterflashing and surface mounted counterflashing.
The lower edge of the flashing should extend about 1 2 beyond the face of the brick and have a downward bend to provide a drip.
1 run membrane down the side of the block and onto the roof underlayment.
Preventing water leakage through masonry façades in contemporary construction is primarily accomplished by the use of well placed flashings.
Sometime the through wall flashing can be the same as the counter flashing.
Install it through the entire thickness of the brick veneer.
Keep doing this until you run out of stepped blocks.
2 fold a vertical strip into the inside corner extending it above the top of the block so that the next layer of flashing will cover it shingle style.
View all 10 photos play slideshow.
As painstaking as this can be it s the only way to prevent water from seeping into the living space below.
Through wall flashing is necessary to redirect moisture that has penetrated the veneer back to the outside.
Flashing generally should extend 8 200 mm above the bottomof the flashingand be fastened to the backup.
It is easy to see why such flashing is commonly referred to as thru wall flashing.